Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
next_meeting_agenda [2019/09/10 05:52] jtumbachnext_meeting_agenda [2019/11/13 02:00] andrew
Line 4: Line 4:
 ==== Saskatoon Techworks Meeting Agenda ==== ==== Saskatoon Techworks Meeting Agenda ====
 --- Time and Location --- --- Time and Location ---
-  * Tuesday, September 10, 2019 7pm+  * Tuesday, November 12, 2019 7pm
   * Location: Saskatoon TechWorks, 412 44th St E    * Location: Saskatoon TechWorks, 412 44th St E 
-  * [[meeting:august_13_2019 | Previous meeting minutes]] (please read ahead of time)+  * [[meeting:october_08_2019 | Previous meeting minutes]] (please read ahead of time)
  
 == Agenda == == Agenda ==
Line 17: Line 17:
  
     * Previous meeting minutes     * Previous meeting minutes
-      * August 13, 2019+      * October 8, 2019
  
-    * Exiting Members +    * New Members 
-      * Jordan Frenzel+      * Dirk Stonehouse 
 +    * Exiting members 
 +      * Devin Stus
  
     * Finances     * Finances
Line 26: Line 28:
     * Social events / group projects         * Social events / group projects    
       * Small talk / Show and Tell        * Small talk / Show and Tell 
-        * August 27+        * November 26
       * Future Workshops / events       * Future Workshops / events
-        * Sep 10 - Refresher on Laser +        * Lathe training
-        * Lathe Training early October - more details to come+
  
       * Newsletter sign up - talk to Mena       * Newsletter sign up - talk to Mena
Line 39: Line 40:
   * Old Business   * Old Business
     * Utilizing existing space     * Utilizing existing space
-      * Taylor working on reorganizing dirty room +      * Taylor working on reorganising dirty room 
-        * he may need volunteers to help move things around+        * following purgatory, equipment will be moved around
     * Equipment repairs     * Equipment repairs
-      * Lathe 
-        * Tail stock crank fixed 
-        * pin to hold tail stock on lathe is back-ordered  
       * Laser       * Laser
-        * laser tube replaced +        * same as last month 
-        controller replaced +      Planer tuned ready to use 
-        * removed second head from carriage  +        * rules will be posted on planer 
-        * coolant and tubing replaced +        * refer to manual any specifics 
-          * more work to be done on pumps +    Expanding into front (Michelle's) area 
-        * refresher on operation needed to use laser +      still ongoing 
-      OMIO +      hoping to firm up in next couple weeks
-        received and built +
-        training being developed +
     * To Do List     * To Do List
       * remove from list       * remove from list
Line 63: Line 59:
  
   * New business   * New business
-    * Expanding into front (Michelle's) area +    * printer toner may be causing issues with print quality 
-      * new budget item ~$1700 for rent/occupancy of front area +      * to get genuine toner cost $550+ 
-      * negotiating Michelle to rent half of space for ~$850 +      * Local ink place is $330 
-      starting with 1 year lease +        Motion to budget $370 for toner, pending further investigation into the printer to determine the toner is the cause, passed unanimously 
-    * Camera in store +    * looking into providing a space for other clubs/groups to host workshops 
-    * Equipment repairs +      * if you know of a group looking to do this direct them to the board at thespace@sktechworks.ca
-      * Planer not safe to be used - taken out of service +
-        * looking into replacement planer  +
-        * motion for $550 budget item for replacement+
     * Open Floor     * Open Floor
  
     * Acknowledgements     * Acknowledgements
-      * Torban for working on laser +      * Scott for continuing to be a super star with the expansion negotiations 
-      * Kevin for looking into planer repair +      * Torban for making the sign before Taylor 
-      * Scott for the omio and front expansion research +      * Brent made a manual laser 
-      * Andrew and Scott for helping with laser +      * Tyler for aligning the mirrors on the laser 
-      * Jeff (landlord) donated welding table+      * Scott for saying he would help out with the training videos
  
-  * Next Meeting - October 8, 2019+  * Next Meeting - December 10, 2019
  
   * Purgatory box   * Purgatory box
next_meeting_agenda.txt · Last modified: 2022/08/10 00:26 by swalde
Back to top
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0