Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
next_meeting_agenda [2020/07/14 15:05] jtumbachnext_meeting_agenda [2022/08/10 00:26] (current) swalde
Line 1: Line 1:
-+===== Agenda for Next Meeting =====+===== Agenda for Next Meeting =====
 This is the agenda for the next meeting. Once the meeting has been held, this agenda will be moved to the page for that meeting, and a new agenda created. This is the agenda for the next meeting. Once the meeting has been held, this agenda will be moved to the page for that meeting, and a new agenda created.
  
-==== Saskatoon Techworks General Meeting Agenda ====+==== Saskatoon Techworks Monthly Meeting plus Special General Meeting Agenda ====
 --- Time and Location --- --- Time and Location ---
-  * Tuesday, July 142020 7pm +  * Tuesday, Aug 92022 7pm 
-  * Location: Saskatoon TechWorks, 412 44th St E, and remote Zoom meeting +  * Location: Saskatoon TechWorks, 412 44th St E 
-  * [[meeting:june_09_2020 | Previous meeting minutes]] (please read ahead of time)+  * [[meeting:july_12_2022| Previous meeting minutes]] (please read ahead of time)
  
 == Agenda == == Agenda ==
 +  * Call to order
 +  * Adoption of Agenda
 +  * Previous Meeting Minutes
 +    * 2022-07-12
 +  * Reports
 +    * Membership
 +      * New Members
 +        * Devin McHugh
 +        * Beau Bernisky
 +        * Lorne Bernisky
 +        * Amanda Middleton
 +      * Returning Member
 +        * Sheila Maithel
 +      * Exiting Members
 +        * Matt Toews
 +        * Aaron Scopick
 +        * Aaron Engel
 +        * Jason Gilbert
 +        * David Snider
 +        * Casey McMahon
 +      * Members in good standing: 66
 +    * Chair
 +      * [[chair_report_20220809|Chair's Report]].
 +    * Finance
 +      * July: Still subject to change, but currently showing gain of $560.
 +      * Projection moving forward: gain of ~ $400/month. (Based on increased rent as of Sept 1st.)
 +      * liquid assets on hand July 31th:  $11,731.44 
  
-  * Regular Items +  * Special Resolution 
-  EquipmentSafety and the Space +    “I move that Saskatoon TechWorks increase the monthly membership dues to $50 plus applicable taxes per month for regular members and $240 (lump sum) plus applicable taxes for eight months for studentsfor all new members and returning members as well as any member who wishes to pay the new, increased rate, effective September 1st, 2022”
-    * Check fire extinguishers +
-    * Quick Clean +
-    * Equipment check+
  
-    Previous meeting minutes +  New business
-      * May 12, 2020 +
-      * June 9, 2020+
  
-    * New Members 
-      * Braedon Leisler 
-      * Brian Lazorko 
-      * Dave Kozicki 
  
-    Finances - monthly +  Acknowledgements
- +
-    * Social events / group projects     +
-      * Future Workshops / events +
-        * Workshops to start back up again soon - check website/facebook for updates +
- +
-      * Newsletter sign up - talk to Mena +
-        * workshops +
-        * events +
-        * projects +
-        * upcoming info +
- +
-  * Old Business +
-    * Equipment +
-      * Belt sander timing belt broken - ordered +
-      * Air compressor fixed +
-      * OMIO - working again - still waiting for extra collet nuts +
-      * Mitre saw has no guard - looking into replacement +
-      * new OLFA knife +
-      * new tape measures +
-      * Programmable controllable thermostat +
-        * $110  +
-        * air conditioner has been set to a low temperature and then left +
-        * prevent large cost that could be incurred from sated situation +
-    * Goals for the coming year +
-      * Upstairs +
-        * Location to store techworks stuff +
-        * Taping off areas  +
-      * Videos +
-        * we have some lighting and AV equipment now +
-        * video editing class/workshop (TBA) +
-        * looking for assistance with techworks title/intro for official videos  +
-      * Community +
-        * group project committee - Rylan +
-          * Thermostats +
-          * Air filter mounting +
-          * Reorganize grinder bench +
-        * bring back social gatherings (when we can) +
-    * To Do List +
-      * Add/Remove/Assign to list +
-    * if a problem is found with the facilities please contact the board +
-      * thespace@sktechworks.ca +
- +
-  * New business +
-    * new laser cutter - needs some work to get up and running +
-    * some benches are going to be moved around +
-    * Open Floor+
  
-    Acknowledgements +  Adjourn
-      * Andrew for getting knives +
-      * John for getting measuring tapes +
-      * Thanks Torban for bringing his laser +
-      * Thanks Chad and Brent for replacing the carpet +
-      * Andrew and Torban for network drops upstairs +
-      * Scott, Rylan, Torban, Erik, John for the new fridge/freezer +
-      * Scott for the snacks +
-      * Thanks everyone for keeping food out of the space and in the back dumpster+
  
-  * Next Meeting - July 142020+  * Next Meeting - Sep 132022 
 +  
  
-  * Purgatory box 
-    * definitely going through this month 
next_meeting_agenda.1594739149.txt.gz · Last modified: 2020/07/14 15:05 by jtumbach
Back to top
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0