Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| meeting:august_9_2016 [2016/08/10 03:08] – reveng | meeting:august_9_2016 [2016/09/14 01:30] (current) – reveng | ||
|---|---|---|---|
| Line 20: | Line 20: | ||
| * Workshops all postponed during our move. | * Workshops all postponed during our move. | ||
| * Collaboration with outside groups: | * Collaboration with outside groups: | ||
| - | * Al is giving a 3D modelling talk at ETC Makerspace in October. | + | * Al is giving a 3D modelling talk at ETC Makerspace in September. |
| - | * James is giving a quadcopter and drone talk at Sask Polytechnic in September. | + | * James is giving a quadcopter and drone talk at Sask Polytechnic in October. |
| * The board has established a student rate package where a full-time student could get a full membership for $240 for 8 months. This will be offered in the fall as students are coming back to school. This is similar to what ENTS and Victoria Makerspace do. Eylon offered to design a poster to put up. John is willing to call up some places to get our posters up. Scott will also talk to Tim Schneider at Sask Polytechnic. | * The board has established a student rate package where a full-time student could get a full membership for $240 for 8 months. This will be offered in the fall as students are coming back to school. This is similar to what ENTS and Victoria Makerspace do. Eylon offered to design a poster to put up. John is willing to call up some places to get our posters up. Scott will also talk to Tim Schneider at Sask Polytechnic. | ||
| * Albert would like us to put together a maintenance schedule for equipment. | * Albert would like us to put together a maintenance schedule for equipment. | ||