Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
next_meeting_agenda [2019/10/08 18:36] jtumbachnext_meeting_agenda [2020/02/11 18:03] jtumbach
Line 4: Line 4:
 ==== Saskatoon Techworks Meeting Agenda ==== ==== Saskatoon Techworks Meeting Agenda ====
 --- Time and Location --- --- Time and Location ---
-  * Tuesday, October 82019 7pm+  * Tuesday, February 112020 7pm
   * Location: Saskatoon TechWorks, 412 44th St E    * Location: Saskatoon TechWorks, 412 44th St E 
-  * [[meeting:september_10_2019 | Previous meeting minutes]] (please read ahead of time)+  * [[meeting:january_14_2020 | Previous meeting minutes]] (please read ahead of time)
  
 == Agenda == == Agenda ==
Line 17: Line 17:
  
     * Previous meeting minutes     * Previous meeting minutes
-      * September 10, 2019+      * December 10, 2019 
 +      * January 14, 2020 
 + 
 +    * Exiting Members 
 +      * Eylon Mogilner
  
     * Finances     * Finances
Line 23: Line 27:
     * Social events / group projects         * Social events / group projects    
       * Small talk / Show and Tell        * Small talk / Show and Tell 
-        * October 22+        * February 25
       * Future Workshops / events       * Future Workshops / events
-        * October 10 Basic Lathe training, available in store $50 +        * Feb 15 Grand opening of new space 
-        * October 17 Advanced Lathe training  +        * May 30 Saskatoon Maker Faire
-        * OMIO training is in the store +
  
       * Newsletter sign up - talk to Mena       * Newsletter sign up - talk to Mena
Line 36: Line 39:
  
   * Old Business   * Old Business
-    * Utilizing existing space +    * Equipment 
-      * Taylor working on reorganizing dirty room +      * Planer needs a tune-up to cut evenly
-        * general layout made need to move equipment around +
-    * Equipment repairs +
-      * Laser +
-        * laser tube power level not up to spec (about what old tube was) +
-        * pursuing options for warranty +
-    * Expanding into front (Michelle's) area +
-      * negotiations still ongoing +
-      * may need to buy supplies for room divider+
     * To Do List     * To Do List
       * remove from list       * remove from list
Line 54: Line 49:
  
   * New business   * New business
-    * Planer assembled but not tuned +    * Grand opening of new area - Feb 15 
-      * please do not use yet +      * Techworks 9 years of operation 
-    * Reminder not to leave tools out +      * volunteers needed 
-      * if you leave tools out that you have brought from home they may end up going through purgatory+    * AGM - Mar 10 
 +      * Returning officer 
 +      * nominations 
 +      * Special items?
     * Open Floor     * Open Floor
  
     * Acknowledgements     * Acknowledgements
-      * Members giving tours to visitors (taylor, kevin, scotts) +      * Everyone who helped get the soft room setup 
-      * Scott for dealing the front space +      * Scott for video computer and equipment 
-      * John for helping Bun-Bun pull cable +      * Mena for newsletter 
-      * Bun-Bun for helping John pull cable +      * Michelle for sewing machine and cutting mat 
-      * Scott mounting camera in the store +      * Carl for donating UV table
-      * Bun-Bun for hooking up the camera in the store+
  
-  * Next Meeting - November 122019+  * Next Meeting - AGM March 102020
  
   * Purgatory box   * Purgatory box
next_meeting_agenda.txt · Last modified: 2022/08/10 00:26 by swalde
Back to top
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0