Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
next_meeting_agenda [2019/08/13 23:36] jtumbachnext_meeting_agenda [2019/11/13 02:00] andrew
Line 4: Line 4:
 ==== Saskatoon Techworks Meeting Agenda ==== ==== Saskatoon Techworks Meeting Agenda ====
 --- Time and Location --- --- Time and Location ---
-  * Tuesday, August 13, 2019 7pm+  * Tuesday, November 12, 2019 7pm
   * Location: Saskatoon TechWorks, 412 44th St E    * Location: Saskatoon TechWorks, 412 44th St E 
-  * [[meeting:july_09_2019 | Previous meeting minutes]] (please read ahead of time)+  * [[meeting:october_08_2019 | Previous meeting minutes]] (please read ahead of time)
  
 == Agenda == == Agenda ==
Line 17: Line 17:
  
     * Previous meeting minutes     * Previous meeting minutes
-      * June 11, 2019 +      * October 8, 2019
-      * June 25, 2019 +
-      * July 9, 2019+
  
     * New Members     * New Members
-      * Jordan Frenzel+      * Dirk Stonehouse 
 +    * Exiting members 
 +      * Devin Stus
  
     * Finances     * Finances
Line 28: Line 28:
     * Social events / group projects         * Social events / group projects    
       * Small talk / Show and Tell        * Small talk / Show and Tell 
-        * August 27+        * November 26
       * Future Workshops / events       * Future Workshops / events
-        * August 24 - Battle Snakes at Innovation Place+        * Lathe training
  
       * Newsletter sign up - talk to Mena       * Newsletter sign up - talk to Mena
Line 39: Line 39:
  
   * Old Business   * Old Business
-    * fundraising for metal CNC mill +    * Utilizing existing space 
-      * get stuff for a donation +      * Taylor working on reorganising dirty room 
-      * last of available Chocolate bars +        * following purgatory, equipment will be moved around 
-    Utilizing existing space - who is going to volunteer +    * Equipment repairs 
-      * Re-arranging dirty room to make certain machines more accessable+      * Laser 
 +        * same as last month 
 +      Planer tuned ready to use 
 +        * rules will be posted on planer 
 +        * refer to manual any specifics 
 +    * Expanding into front (Michelle's) area 
 +      * still ongoing 
 +      * hoping to firm up in next couple weeks
     * To Do List     * To Do List
       * remove from list       * remove from list
Line 52: Line 59:
  
   * New business   * New business
-    * Equipment repairs +    * printer toner may be causing issues with print quality 
-      * Lathe +      * to get genuine toner cost $550+ 
-        * Tail stock crank was broken +      * Local ink place is $330 
-        * if you break equipment or notice broken equipment - email thespace@sktechworks.ca +        * Motion to budget $370 for toner, pending further investigation into the printer to determine the toner is the cause, passed unanimously 
-        * timely notification means less downtime +    looking into providing a space for other clubs/groups to host workshops 
-      * Laser +      if you know of a group looking to do this direct them to the board at thespace@sktechworks.ca
-        * laser tube broke +
-          * most likely due to heat/cooling issue +
-          motion - replace tube and upgrade laser cutter controller/software +
-            * costs to be discussed during meeting +
-          replace plumbing on laser cutter and add additional fail-safes to prevent a repeat +
-      * OMIO +
-        * met fundraising goal +
-        * order for OMIO and associated hardware in process+
     * Open Floor     * Open Floor
  
     * Acknowledgements     * Acknowledgements
-      * James for getting tools +      * Scott for continuing to be a super star with the expansion negotiations 
-      * Rylan for ordering parts for the lathe +      * Torban for making the sign before Taylor 
-      * Torban for investigating the laser tube and spearheading the repairs/modifications+      * Brent made a manual laser 
 +      * Tyler for aligning the mirrors on the laser 
 +      * Scott for saying he would help out with the training videos
  
-  * Next Meeting - Sept 10, 2019+  * Next Meeting - December 10, 2019
  
   * Purgatory box   * Purgatory box
next_meeting_agenda.txt · Last modified: 2022/08/10 00:26 by swalde
Back to top
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0