The new and improved Saskatoon Techworks wiki, powered by DokuWiki.

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
meeting:june_13_2017 [2017/06/13 22:33]
andrew
meeting:june_13_2017 [2017/07/11 23:03] (current)
andrew
Line 3: Line 3:
   * Motion to accept meeting minutes from May 09, 2017 postponed due to not meeting quorum ​   * Motion to accept meeting minutes from May 09, 2017 postponed due to not meeting quorum ​
   * New Members   * New Members
 +    * No new members
   * Finances   * Finances
     * Income: $2,472.01 Expenses: $2,036.98 Net income for month: $435.03, Recognized net income for month: $-664.77 (loss)     * Income: $2,472.01 Expenses: $2,036.98 Net income for month: $435.03, Recognized net income for month: $-664.77 (loss)
Line 32: Line 33:
     * Jeff MK for lending thickness planer     * Jeff MK for lending thickness planer
       * Note about discussing details with Jeff MK and enforcing proper cleanup after using the planer       * Note about discussing details with Jeff MK and enforcing proper cleanup after using the planer
-    * Chevez for making a illegal ​laser cut light switch cutter for the laser+    * Chevez for making a laser cut light switch cutter for the laser power switch
   * Equipment maintenance schedule   * Equipment maintenance schedule
     * No current known issues     * No current known issues
Line 38: Line 39:
     * Door System     * Door System
       * Locksmith made some corrections to latch       * Locksmith made some corrections to latch
-      * Andrew changed power supply ​which inner door reliability+      * Andrew changed power supply ​on inner door
       * Scott created door system status page       * Scott created door system status page
         * Should this be left open? No one against. Feature creep plans to add aditional devices and information to this page          * Should this be left open? No one against. Feature creep plans to add aditional devices and information to this page 
Line 58: Line 59:
   * Next Meeting - 11 July 2017   * Next Meeting - 11 July 2017
   * Purgatory ​   * Purgatory ​
-  ​* Motion to adjourn not possible therefore meeting can never end.+  ​
Print/export
QR Code
QR Code meeting:june_13_2017 (generated for current page)