Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
meeting:august_9_2016 [2016/08/10 03:08] – reveng | meeting:august_9_2016 [2016/09/14 01:30] (current) – reveng | ||
---|---|---|---|
Line 20: | Line 20: | ||
* Workshops all postponed during our move. | * Workshops all postponed during our move. | ||
* Collaboration with outside groups: | * Collaboration with outside groups: | ||
- | * Al is giving a 3D modelling talk at ETC Makerspace in October. | + | * Al is giving a 3D modelling talk at ETC Makerspace in September. |
- | * James is giving a quadcopter and drone talk at Sask Polytechnic in September. | + | * James is giving a quadcopter and drone talk at Sask Polytechnic in October. |
* The board has established a student rate package where a full-time student could get a full membership for $240 for 8 months. This will be offered in the fall as students are coming back to school. This is similar to what ENTS and Victoria Makerspace do. Eylon offered to design a poster to put up. John is willing to call up some places to get our posters up. Scott will also talk to Tim Schneider at Sask Polytechnic. | * The board has established a student rate package where a full-time student could get a full membership for $240 for 8 months. This will be offered in the fall as students are coming back to school. This is similar to what ENTS and Victoria Makerspace do. Eylon offered to design a poster to put up. John is willing to call up some places to get our posters up. Scott will also talk to Tim Schneider at Sask Polytechnic. | ||
* Albert would like us to put together a maintenance schedule for equipment. | * Albert would like us to put together a maintenance schedule for equipment. |