Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
meeting:august_08_2017 [2017/08/09 01:41] andrewmeeting:august_08_2017 [2017/09/13 01:13] (current) andrew
Line 4: Line 4:
   * New Members   * New Members
     * No new members     * No new members
-    * John encourages current members to refer family and friends to sktechworks and think of other ways we an attract new members+    * John encourages current members to refer family and friends to Techworks and think of other ways we can attract new members
   * Finances   * Finances
     * James didn't have finances updated for meeting     * James didn't have finances updated for meeting
     * We were break even before rent increase and loss of member     * We were break even before rent increase and loss of member
   * Social events   * Social events
-    * 12 August 2017, Techworks summer social  +    * 12 August 2017, 11AM, Techworks summer social, bring your own steak for sous vide and laser grilling, bring board games if you wish 
-    * 22 August 2017, Need volunteers for presentation+    * 22 August 2017, Scott "Silicon - Three way" presentation 
 +    * 26 September 2017, looking for presentation volunteer
     * 27-29 October 2017, Calgary Maker Faire     * 27-29 October 2017, Calgary Maker Faire
     * 28-29 October 2017, pet expo at Market Mall in old zellers building. Will be a table setup if anyone is interested.      * 28-29 October 2017, pet expo at Market Mall in old zellers building. Will be a table setup if anyone is interested. 
   * Acknowledgements   * Acknowledgements
-    * Taylor for sharing his project last month +    * Albert for his presentation on battle bots 
-    * Chevez and Scott for tuning up the laser +    * Mystery person for cleaning/organizing the dirty room 
-    * Scott for holding workshops +
-    * Mystery person for organizing the dirty room +
-    * Al for hosting the bachelor party+
   * Equipment maintenance schedule   * Equipment maintenance schedule
-    * We are short a mouse +    * Laser cutter currently experiencing ghosting and reduced cutting performance 
-    * Both laser cutters need flow sensors+      * re-alignment most likely required 
 +      * when using the laser cutter make sure the head does not ram into objects 
 +      * make sure head is up before turning on my machine (raise up when done as well) as the head can hit the honeycomb base during the startup homing procedure  
 +    * laser cutters need flow sensors 
 +    * remember to clean up when done with equipment and/or the space 
 +    * remember to put away tooling when done with and/or when changing ex. drill bills and keep parts of equipment with the equipment so they don't get misplaced/thrown out.
   * New Business   * New Business
-    * Al is going to make a sign up sheet for members who are interested in training on equipment +    * Front door - do not wedge open it will damage the hinges 
-    * Al is coming up with some hackathon/competition challenge ideas for members to participate +    * Taylor volunteers to finish all the drywall 
-    Library still looking for helpers for button workshops +      Feel free to help him 
-    * Mystery person is not finished organizing the dirty room, they would like to move the lathe and would like some help +    * Making techworks more trendy - improve first impressions of the space 
-    * John asked the attendees what they would like to see happen around the space +      * If anyone has any ideas for projects or improvements to the space, feel free to go ahead and do them 
-      * Sheila suggested Christmas themed workshops closer to Christmas +      * Permanent fixtures will need board approval, submit requests to thespace@sktechworks.ca 
-      * Al suggests a "Techworks" project that members can work on together +    Storage issues 
-        * Enter Techworks into a competition (ginger bread house competition was an example) +      No storage of anything in the dirty room 
-        * Structured with a schedule +      * If you need to longer term storage for projects we have space for rent on shelves and upstairs: $10/shelf or $10/15sqft per month. 
-      * Chevez suggested adding dynamic lighting to catch the eye of members and potential members to be more memorable +      Scrap bin is by back door for items that fit in it only, larger items are to be taken home or thrown out 
-      * Add more production/promotion to events +  * Next Meeting - 12 September 2017
-      Al hates our Facebook page +
-        Scott has been neglecting the page encouraging people to go to the group +
-      * James suggested a system for members to borrow tools from the space +
-        Members showed hesitation out of concern of tools be gone when they come to the space to use themed +
-        * John said this would require a lot of regulation that we probably aren't ready to commit to +
-        * Scott suggested a community toolshare +
-        * Al likes the idea just needs to be thought out +
-    * Al moved the scrap bin to the back, suggesting material not be stored in the dirty room +
-    * John reminds members there is still space available to rent +
-  * Next Meeting - 8 August 2017+
   * Material Policy   * Material Policy
     * Purgatory Box       * Purgatory Box  
-  * Motion to adjourn accepted unanimously.+  * Motion to adjourn can not be accepted (non quorum)
meeting/august_08_2017.txt · Last modified: 2017/09/13 01:13 by andrew